Ames Construction with design engineer Alliant Engineering found ways to go beyond MnDOT requirements in completing this design-build project ahead of schedule and with reduced impacts on vehicular traffic.
The I-35W route connects greater Minnesota and the northern suburbs to Minneapolis. With ongoing development, traffic volumes have increased over the years, recently averaging between 53,000 to 127,000 vehicles on the highway per day.