In July, Harvey | Harvey-Cleary celebrated the mat pour at 415 Colorado in downtown Austin, Texas. The placement consisted of 3,150 cubic yd of concrete from 315 trucks placed over a 10-hour time period.
Trahan captured the shot using his iPhone from the terrace of a neighboring building.