Energy/Industrial, Award of Merit Diamond Green Diesel No.2 Plant Expansion
The $39-million Diamond Green Diesel No. 2 Plant Expansion was designed to more than double the capacity of renewable diesel at DGD’s Norco, La., refinery.
Construction involved the logistical challenges of working in a live facility with a small footprint. Primoris Design and Construction worked with the owner to coordinate the movement of materials and work execution without interrupting existing plant operations.