Nucor Corp. is planning to construct a steel melt shop at one of its five existing bar mills (Kingman, Ariz.; Plymouth, Utah; Seattle, Wash.; Norfolk, Neb.; or Jewett, Texas). The project scope includes construction of building space and equipment foundations; erection of structural steel; installation of an electric arc furnace and casting equipment; and purchase and installation of overhead cranes, cooling towers, storage silos and air emissions control equipment. The mill will have the capacity to produce 600,000 tons of steel per year. Nucor will manage construction in-house. The melt shop is expected to be operational in 2024. The estimated EPC cost is $100 million. Nucor Corp., 1915 Rexford Rd., Charlotte, N.C., 28211. IR#UT210905.