Holes drilled at a 30-degree angle rather than vertically, plus inadequate decking, contributed to the Aug. 21 subway station project excavation blast that broke several store windows on the east side of Manhattan in New York City, according to preliminary investigation results. The information was released by the Metropolitan Transportation Authority, which is building the $4.45-billion Second Avenue Subway project.