State transportation departments wishing to replace bridges faster using accelerated bridge construction, or ABC, techniques will soon have a standardized design tool kit as a reference.
Developed as part of the second Strategic Highway Research Program(SHRP 2) and administered by the Transportation Research Board (TRB), the tool kit contains standardized plans for modular components, erection concepts, construction specs and other data that can be applied to a wide range of projects.