Two parallel 5.7-kilometer tunnel excavations will soon start in Vancouver, B.C., as part of the Millennium Line subway extension that includes six new stations.
The twin earth-pressure-balance tunnel-boring machines are each 19.6 ft in diameter, about the height of a three-story home. The machines are 328 ft long and weigh about 1,000 tons.