German contractor Hochtief A.G. on March 5 completed the sliding of a 985-meter-long road bridge 19.5 m sideways onto awaiting supports in 6.5 hours in a project to replace the Lennetal Bridge carrying the A45 highway close to Hagen in North Rhine-Westphalia.