Nearly eight months after the emergency closure of the West Seattle Bridge, Seattle Mayor Jenny Durkan announced Nov. 19 a decision to repair, not replace, the cracked span over the Duwamish River, aiming to have traffic flowing on the bridge again in 2022.
A replacement of the span would have pushed the finished timeline to 2025 or 2026.