Getting supersized prefabricated steel modules to the Kearl oil-sands project in Alberta is proving to be the toughest part of the job for Canada’s Imperial Oil and ExxonMobil Canada. The evidence is in Lewiston, Idaho.
As part of the companies’ $8-billion construction project to produce as much as 345,000 barrels per day of oil roughly 45 miles north of Fort McMurray, Alberta, Imperial Oil sourced 207 prefabricated specialized bitumen plant modules from SungJin Geotec in South Korea.