You have 0 Articles Left This Month. Join ENR UNLIMITED for Full Access.
Humboldt Bay Power Plant Decommissioning Eureka, Calif. Best Project
Owner: Pacific Gas and Electric Co. Lead Design Firm: McMillen Jacobs General Contractor: Aptim Civil Engineer: Whitchurch Engineering Structural Engineer: Drill Tech Drilling & Shoring Nuclear Demolition Contractor: Northwest Demolition & Dismantling; Northwest Demolition Canada ULC Geotechnical-Dewatering Consultant: Geosyntec Consultants
You have 0 complimentary articles remaining.
JOIN ENR UNLIMITED to Unlock Full Access + Premium Benefits.
Get started for as low as $9 a month!
Already a Subscriber or UNLIMITED Member?Login Now or Register Your Email
What is ENR UNLIMITED?