Owner U.S. Army Corps of Engineers, NY District Architect and Engineer of Record Clark Nexsen General Contractor Walsh Construction Design Architect STV/URS Joint Venture Geotechnical Surveying Tectonic Engineering & Surveying Consultants Commissioning Agent AECOM Technical Services Inc.
Davis Barracks, the first barracks built at the U.S. Military Academy at West Point in 45 years, is a design-build project that was completed in 2017 for $183 million—$3 million under budget. The six-story, 287,000-sq-ft, military-gothic-style structure is faced with 167,901 individually shaped granite blocks for long service life, ease of maintenance and to help the post maintain its nearly 60-year designation as a national historic landmark.