Two buildings, totaling more than 800,000 sq ft, an eight-story parking garage and a 400-ft pedestrian bridge, all built simultaneously with different construction methods, comprise Southwest Airlines’ (SWA) new Wings Facilities project, located at the airline’s corporate campus near Love Field in Dallas. Construction costs on the project total $200 million.
McCarthy Building Cos. and architect BOKA Powell are tackling this immense project, and together with SWA have overcome obstacles that included limited site access, inclement weather and a tight schedule.