You have 0 Articles Left This Month. Join ENR UNLIMITED for Full Access.
The Gut Bridge Replacement Project South Bristol, Maine Award of Merit
Owner/Civil Engineer: Maine Dept. of Transportation Lead Designer/Structural Engineer/MEP Engineer/Electrical Engineer/Geotechnical Engineer: Hardesty & Hanover LLC Civil Engineer: Hardesty & Hanover and Maine Dept. of Transportation General Contractor: Cianbro Corp. Subcontractors: Westwork Contracting Services Inc. and Pepperrell Cove Marine (Diving); Plummer Excavation Inc.; Independent Concrete Pumping; J E Butler LLC (Bridge Demolition)
You have 0 complimentary articles remaining.
JOIN ENR UNLIMITED to Unlock Full Access + Premium Benefits.
Get started for as low as $9 a month!
Already a Subscriber or UNLIMITED Member?Login Now or Register Your Email
What is ENR UNLIMITED?