A stopgap Federal Aviation Administration authorization has been moving rapidly through Congress, as lawmakers seek to avert a cutoff of new FAA airport construction grants.
The House on July 11 passed the 14- month FAA extension, and the Senate at ENR press time was poised to do the same. President Obama was expected to sign the measure by July 15, when a temporary authorization is set to lapse.