2/16 The Coachella Valley Water District seeks statements of qualifications from general contractors for the Mission Hills and Sky Mountain Transmission Mains and Booster Station Project. The two-phase effort will cost up to $40 million. Project 1 will construct approximately five miles of 36-in. ductile iron domestic water transmission pipelines within the Rancho Mirage and Thousand Palms area. Project 2, the Highway 86 Transmission Main, includes construction of approximately 7.2 miles of 30-in. ductile iron domestic water transmission pipeline and appurtenances, plus a 3,000-sq-ft booster station building. Coachella Valley Water District, 75515 Hovley Ln., East Palm Desert, 92211-5104. DR#12-00660595
2/17 The Alameda-Contra Costa Transit District extended the bid date to Feb. 17 from Feb. 3 for the East Bay Bus Rapid Transit (BRT) Project Infrastructure and Station Platforms. The $95-million project will construct stations, infrastructure and components along an approximately 9.5-mile arterial corridor through the cities of Oakland and San Leandro. Alameda-Contra Costa Transit District, 1600 Franklin St., Fl. 8, Oakland, 94612-2806. DR#15-00676029