You have 0 Articles Left This Month. Join ENR UNLIMITED for Full Access.
To produce more hydropower, the city of Sitka, Alaska, added a 15.9-megawatt powerhouse to the 1950s-era Blue Lake Dam.
Design firm Hatch Consultants worked to bring the 145-ft-tall concrete arch dam to its maximum geotechnical height by raising it 83 ft.
You have 0 complimentary articles remaining.
JOIN ENR UNLIMITED to Unlock Full Access + Premium Benefits.
Get started for as low as $9 a month!
Already a Subscriber or UNLIMITED Member?Login Now or Register Your Email
What is ENR UNLIMITED?