ENR Texas & Louisiana’s judging panel was nearly unanimous in selecting the 2015 Project of the Year. Out of more than 100 entries, the Imperial Palace (IP) Casino Dry Dock emerged as the judges’ top pick.
“This project had an impressive safety record and project outcome,” one judge noted, “with unusual challenges that required innovative design and construction solutions—most of them underwater with zero visibility. All done without disrupting casino operations. I felt there was a ‘wow factor’ in reading about this.”