The article "Mega Projects Need More Study Up Front To Avoid Cost Overruns" was interesting but nothing new (ENR 7/15 p. 11). It doesn't take a brain surgeon to know that a definitive project scope of work and competent cost estimate, taking into account all variables and preferably performed by a cost engineer or quantity surveyor, are part of the solution.