Boston Unveils $6.5-Billion Section of Central Artery Job
KICKOFF Testing is under way at I-90 vent building (left) at Fort Point Channel.
There's a cold wind blowing through downtown Boston and that is warming the hearts of Central Artery/Tunnel managers. As final tests wind up on the tunnel ventilation system, the CA/T is set to open on Jan. 20 a $6.5-billion, 3.5-mile section linking Logan International Airport to Interstate 90.