The Fairmead Route 99 project was designed to remove the at-grade crossings that have allowed the local traffic to cross Route 99 traffic, and add one more travel lane in both the northbound and southbound directions. The $51.1-million project consisted of building a new frontage road to collect the county roads and build two bridges to carry this traffic over Route 99 and the railroad that parallels the route.