The Panama Canal Authority has opened the bid process for the $3.35-billion locks portion of the ongoing massive expansion of the historic waterway.
The "design-build" contracts will include the construction of two new sets of locks allowing the massive post-Panamax ships to utilize the waterway. The entire $5.25 billion expansion is expected to double the capacity of the historic waterway by the time it is complete in 2014.