Concrete Culverts at Sand Bend, 4-Mile Draw Get New Slabs
Work is expected to wrap up this month on the Texas Department of Transportation repairs on two aging bridge class box culverts north of Pecos on U.S. 285. The highway serves as a main trucking route from New Mexico south to the Rio Grande.
TxDOT is placing new concrete slabs on both structures, which were built in 1932 and widened in 1959.