Located in front of the 1100 Louisiana building in the center of downtown Houston, construction of the new Enterprise Plaza Fountain required detailed planning by the project team. Crews worked nights and weekends to create the intricate water feature to avoid interactions with pedestrians and vehicular traffic.
Since the project was built over an existing loading dock, the new piping had to be incorporated with existing equipment. The effort required meticulous planning, since every pipe location had to be re-routed from the original design in the drawings to maximize water flow and minimize pipe length.