A three-story high, wild maze of tube steel with pieces weighing as much as 5,000 lbs is currently under construction at the Children’s Museum of Phoenix.
Known as the Schuff Perini Climber, the project’s original educational and physical concept has morphed into a much more dramatic exhibit due to the enthusiasm of the construction community. The climber gradually evolved into a gigantic steel labyrinth that involves Perini Building Co., construction manager; Schuff Steel Co., the steel fabricator and erector; Ganymede Design Group; Bakkum Noelke Consulting Structural Engineers; Draft-Tech, Structural Detailers; and 37 other subcontractors and vendors.