This design-build project, one of ADOT�s largest, widens approximately 9.8 mi of the Loop 202 freeway from four to six lanes, adding new HOV and auxiliary lanes from the I-10/SR-51 interchange in downtown Phoenix to the Loop 101 in Tempe. The project also includes 22 bridges (including the 1-mi-long Salt River Bridge over the Salt River and Tempe Town Lake); reconstruction of ramps, noise and retaining walls; modifying the drainage system; landscaping; and installing an updated freeway management system.