Spanning from the Tramway Interchange up to N.M. 473 in Bernalillo, this roadway reconstruction and widening project on Interstate 25 will expand the roadway to six lanes (three in each direction) and will also include a drainage structure extension, concrete box culvert underpass in Sandia Pueblo connecting the pueblo with the Sandia Casino and full replacement of the Sandia Wash Bridge.