Lane Construction Corp. completed the $126.4-million SR 408 improvement project, the largest ever let by the Orlando Orange County Expressway Authority in Florida, in October 2009. The project was on time, under budget and without a lost-time accident.
The job entailed widening of eight existing bridges, reconstruction of one bridge, construction of two new bridges, design-build of architectural precast at bridges, widening the highway from six to eight lanes and replacement of rigid concrete pavement with asphalt pavement.