Central Valley at Snake River LandingSubmitted by SRL Development The 30-acre Central Valley at Snake River Landing was formerly an aggregate quarry and batch plant that has been redeveloped as the main stormwater detention and irrigation system for the 450-acre, mixed-use development.
Innovation was key in designing the Central Valley project, which includes four acres of water surface and more than 3,000 lin. ft of running stream. In order to generate less waste from the mined-out quarry, SRL Development used what was readily available on site for key features of the Central Valley.