You have 0 Articles Left This Month. Join ENR UNLIMITED for Full Access.
Submitted by Ames Construction Inc.
This project replaced two highway bridges using a technique called accelerated bridge construction, which utilizes precast concrete abutments and precast concrete deck panels. It also widened one mile of roadway and demolished an existing bridge.
You have 0 complimentary articles remaining.
JOIN ENR UNLIMITED to Unlock Full Access + Premium Benefits.
Get started for as low as $9 a month!
Already a Subscriber or UNLIMITED Member?Login Now or Register Your Email
What is ENR UNLIMITED?