UDOT has joined forces with West Jordan City and Jordan Valley Water Conservancy District to improve 7800 South between 2700 West and 4800 West.
The roadway will be resurfaced using full-depth reclamation, which recycles the existing road surface into new road base at significant cost savings. Crews are installing curb, gutter and sidewalks between 2700 and 4800 West.