Deck Rehab Under Way on Chicago�s Congress Parkway Bridge
Deck replacement is under way on Chicago�s 54-year-old Congress Parkway Bridge.
This phase of the project takes out the existing open-grid steel deck and replaces it with new closed-deck system that has a skid-resistant surface to make a smoother, safer ride for drivers.