Metropolitan St. Louis Lower Meramec River Wastewater Treatment Plant Completed
Kwame Building Group, St. Louis, has completed the last of eight separate construction management contracts on the Metropolitan St. Louis Sewer District (MSD) Lower Meramec River facility in South St. Louis County.
Kwame, which specializes in construction management, has performed 37% of the total construction management work on the project since 2001, as a sub-consultant to Jacobs Engineering (formerly Sverdrup Civil, Inc.).