The $141.5-million San Francisco-Oakland Bay Bridge Detour Tie-In Roll-Out/Roll-In project involved the replacement of a portion of the truss on the bridge. A 300-ft, 3,300-ton, double-deck section of the East Span was cut and removed then replaced with a seismically upgraded 3,600-ton replacement structure.