Family Housing Replacement is a design/build fast track project located in the Denali Village area on Fort Wainwright, AK. Extensive site work has been required to deal with permafrost and unsuitable soil issues to make the site suitable for a subdivision consisting of 200 Units of Junior and Senior Non-Commissioned Officer Housing with all associated infrastructure. Five different housing types in 4-plex configurations are situated on curvilinear streets with direct buried water, sewer, electrical and glycol circulation systems.
Project Name: Family Housing Replacement, Denali Village Location: Fort Wainwright, Ak. Start Date: May 2007 End Date: September 2009 General Contractor: Neeser Construction Project Cost: $118 million