As part of its quest to conserve energy and operate a more efficient facility, Maxim Integrated Products of Beaverton, Ore., has installed the first of several FANWALL® arrays, retrofitting existing air-supply units.
“We’re doing it to save energy, and we looked to get better performance improvement and less maintenance at the same time,” says Pankaj Patel, facilities project engineer at semiconductor manufacturer Maxim.