Building 131,000 sq ft of retail space atop reclaimed tidal swamp land and a brownfields site nearly pushed this project’s site and foundation costs out of reach for the owner.
To counteract these heavy up-front costs, BPGS Construction had to pay close attention to the materials, means and methods required to construct the building. That involved heavy design review and revision to bring the estimated costs of the project in line with the funding in place.