Nearly five years late and with about $50 million in cost overruns, the Paul S. Sarbanes Transit Center opened in Silver Spring, Md., a Washington, D.C., suburb, on Sept. 20.
Operation of the three-level regional rail, bus and taxi hub “was off to a good start,” said one local media report on Sept. 21. But construction of the 259,000-sq-ft cast-in-place structure had been plagued by evidence of surface cracking and concrete spalling.