Replacement of the historic 76-year-old, 120-ft-long Chelsea Street Drawbridge in East Boston will smooth the journey not only of 20,000 daily motorists but of barges supplying fuel for Logan International Airport and the northeast region.
The project will double the width of the Chelsea River Federal Channel and provide 175 ft of vertical clearance. The old bridge restricted shipping to a 96-ft section of the channel.