Doubling up in Las Vegas usually means doubling the size of your bet. At the new terminal at McCarran International Airport, the steel erector’s detailing subcontractors doubled the number of staff working on the project. That and other measures other measures paid off big.
Terminal 3 is expected to open in mid-2012 and will cost approximately $2.4 billion. It will span 1.9 million square feet, and include 14 gates and a multistory parking garage.