Riverbank Power of Toronto is targeting a 2015 completion for its Riverbank Wiscasset Energy Center in Wiscasset, a project estimated at $2 billion. The underground renewable power-generation facility will produce carbon-free electricity from turbines located underground near a suitable water source. The facility with have a combined installed capacity of 1,000 MW. Malcolm Pirnie/ARCADIS is the project's consulting engineer. Riverbank Power, Royal Bank Plaza, South Tower, 200 Bay St., Suite 3110, Toronto, Ontario, M5J2J4. DR#08-00817781.